Ugh.

So B hired a guy to do the turtle fence. The guy made a big deal about how he HAD to come the next day. The next day he didn't show, called and said his trencher was broken and he would have to come a few days later. When he did show up, the trencher he had wouldn't work close to the fence. He said "I'll come back tomorrow with my other trencher." I don't think he came back the next day, but the one after that he came with a trencher, trenched (way too far form the fence) and left because he "had to return the trencher."

The next time he came back was a few days later. He "got a lot done" but then he left because he "needed topsoil." I asked B "Why does he need topsoil? He digs a trench, he fills the trench." So we went to look and saw why: he wasn't burying the wire in the trench, he was just laying it on the ground and piling soil on top of it. Against the fence, btw.

B communicated with him that it wasn't correct. He came back today and redid a portion of it. But I went out just now to look at it and ehhh. It's really sloppy. A lot of the wire is visible just on top of the ground, and it arcs outward away from the fence, across the ground, and into the trench, instead of just going down flush with the ground. I am not sure if it is secure, and I know it's really sloppy. He communicated that we won't be back until next Wednesday.

This guy is HOURLY and on two separate days he has nor followed instructions. He's done a shit job. B hired him off fiver so we have to figure out how we can fire him and not pay him for all the hours he "worked."
This account has disabled anonymous posting.
(will be screened if not on Access List)
(will be screened if not on Access List)
If you don't have an account you can create one now.
HTML doesn't work in the subject.
More info about formatting
.

Profile

00goddess: White phalaenopsis with faint veining in bright pink. (Default)
00goddess

Most Popular Tags

Powered by Dreamwidth Studios

Style Credit

Expand Cut Tags

No cut tags